Kitchen transformation in process

As with many remodels, there was, initially, a driving force that triggered the process.  In this case mold discovered in the kitchen was the starting point.

the original kitchen




the space was gutted and the ceiling raised,

windows reshaped and replaced to maximize the gorgeous view,


new cabinetry from Bartlett’s Fine Cabinetry set in place,


the wall opened between kitchen and dining area.


limestone slabs installed as counter tops and back splash,



a myriad of other decisions made, pending installation.

The space promises to be all that we have dreamed and more!

General Contractor:  Robert Taylor and Associates

Design:  W Designs

We’ll be sharing the finished kitchen soon…..along with the rest of the project!!!

1 Comment

Filed under Interiors

One response to “Kitchen transformation in process

  1. Anna Abbey

    Thanks for sharing the process with us. Love the limestone slabs!

Leave a Reply

Fill in your details below or click an icon to log in: Logo

You are commenting using your account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s